Menu
Your Cart

Long Lead-acid battery 12V 200AH

 Long Lead-acid battery 12V 200AH
Inquiry
Long Lead-acid battery 12V 200AH
Rs42,900/-

FEATURES:

Nominal Voltage(V)

12V

Nominal Capacity

10 hour rate (20A to 10.80V) 200Ah
5 hour rate (34A to 10.20V) 170Ah
1 hour rate (120A to 9.60V) 120Ah

Weight

Approx. 67.1kg(148Lbs.)
Internal Resistance (at 1KHz) Approx. 2.7 m?

Maximum Discharge Current for

5 seconds: 1600A
Charging Methods at 25?(77?)

Cycle use:

Charging Voltage 14.4 to 15.0V

Coefficient -5.0mV/?/cell

Maximum Charging Current? 60A

Standby use:

Float Charging Voltage 13.5 to 13.8V
Coefficient -3.0mV/?/cell

Operating Temperature Range

Charge -15?(5?) to 40?(104?)
Discharge -15?(5?) to 50?(122?)
Storage -15?(5?) to 40?(104?)
Design Life 12 years

Charge Retention (shelf life) at 20?(68?) 1 month 98?

3 month 94?
6 month 85?
Case Material ABS
(Option: UL94 HB & UL94 V-0 flame retardant )

Terminal

F18

Write a review

Note: HTML is not translated!
Bad Good
Captcha