Menu
Your Cart

Long Lead-acid battery 12V 1.2AH

 Long Lead-acid battery 12V 1.2AH
Long Lead-acid battery 12V 1.2AH
Rs880/-

FEATURES:

Nominal Voltage(V):

 12V

Nominal Capacity:

20 hour rate (0.06A to 10.50V) 1.2Ah
10 hour rate (0.114A to 10.50V) 1.14Ah
5 hour rate (0.204A to 10.20V) 1.02Ah
1 C (1.2A to 9.60V) 0.68Ah
3 C (3.6A to 9.60V) 0.48Ah

Weight:

 Approx. 575g(1.27Lbs.)
Internal Resistance: (at 1KHz)
 Approx. 75.4 mΩ

Maximum Discharge Current for:

5 seconds: 18A
Charging Methods at 25℃(77℉)

Cycle use:

Charging Voltage 14.4 to 15.0V
Coefficient -5.0mv/℃/cell
Maximum Charging Current: 0.36A

Standby use:

Float Charging Voltage 13.50 to 13.80V
Coefficient -3.0mv/℃/cell

Operating Temperature Range:

Charge -15℃(5℉) to 40℃(104℉)
Discharge -15℃(5℉) to 50℃(122℉)
Storage -15℃(5℉) to 40℃(104℉)

Charge Retention: (shelf life) at 20℃(68℉)

1 month 92%
3 month 90%
6 month 80%

Case Material ABS:

(Option: UL94 HB & UL94 V-0 flame retardant )

Terminal:

 F1 or F2 (Faston Tab 187 or 250)

Write a review

Note: HTML is not translated!
Bad Good
Captcha